Keeping you power distribution system up to the standard requires
periodic electrical testing and maintenance program to be in place (see InterNational Electrical Testing Association's article on the issue:
Frequency of Maintenance Tests. In general, 1 – 3 year testing frequency is advisable, depending on the age and condition of you equipment.
Even if you do have a periodic maintenance and testing program in place,
you may not have the resources or the time to manage and oversee an effective and economic testing program.
PowerCore Engineering is not in a business of electrical maintenance and testing:
> we act simply as consultants on behalf of your company to design, implement and oversee the electrical testing and maintenance.
Our extensive experience in field testing (see
Profile section) of electrical power distribution equipment:
- Devise an effective electrical testing program.
- Prepare testing specifications and schedule.
- Eliminate unnecessary testing (frequency and scope).
- Assist in selecting the testing agency or a contractor.
- Ensure that the selected testing agency performs the work as outlined.
- Review the results of the tests and recommend actions ONLY if necessary.

Having

act on your behalf will save you money in the long term by reducing you maintenance cost without sacrificing effectiveness.
Not only will we ensure that any problems encountered are dealt with in a timely and effective manner, but we'll also ensure that you

 
pay a fair price for only the components you need!